首页 > 毕业论文百科 > 土木专业毕业论文翻译

土木专业毕业论文翻译

发布时间:

土木专业毕业论文翻译

Civil Engineering, the oldest in human history, "technical science" as a system of industrial activity in real terms in the production process of a civil engineering technical processCivil Engineering and also the construction of various engineering facilities in science and technology, collectively referred to as both an object refers to the construction that is built on the ground, underground, underwater engineering facilities also refers to a variety of applied materials, equipment and carried out survey and design, construction, maintenance, repair and other technicalAs an important basic disciplines of Civil Engineering has its important properties: a comprehensive social and artistic unity of practical technical and economic progress along with the development of human society, it has been turned into large-scale civil engineering disciplines and has integrated many branches such as: construction work Railway road works in bridge engineering specialty engineering structures water drainage port engineering Hydraulic Engineering Environmental Engineering, Civil Engineering and a total of six professional disciplines such as: Architecture, Urban Planning, Civil Engineering and Building Environment and Equipment Engineering water drainage works and road and bridge worksIntroduction to course through a semester to study Civil Engineering and I have deeply felt the taste of Civil Engineering and cover a wide range of achievements of their predecessors have insight as a civil engineer major responsibility of course, we can not be immersed in the brilliant achievements have been made before we do not stop It should be with the times to dig to find them to think to think to be innovative at this as a civil engineer in China's future I would like to combine history, Civil Engineering, with the national situation and world situation talk about the future of civil engineering road!

这个要靠你自己找了,你可以上万方网找,还有那也可以找的.但你们学校必须买那样的数据库.

已经发到你邮箱。

实验室测试氯去除 核心N_ 7获得7英尺(米)以上的高潮。由于这个核心只包含 约 _C1-/yd3(公斤/米3),仍然达到了的A / ft_(6甲/ mz的)氯 去除电流密度,预计该地区将被视为实现这一电流 密度,如果不立即更快。 核心岩相分析 对于具体的核心N_ 7被视为轻微引气混凝土(3特点 百分之四)与1项。 (厘米)标称尺寸砂石骨料和天然砂。该 粗骨料是硅质砾石组成的equidimensional,四舍五入到圆角, 沉积岩卵石。近似模态比例分别为百分之67石英 岩屑和orthoquartzite,百分之23燧石和石英脉粗百分之十。切尔特卵石 大多微晶,斑驳的褐色类型,少数罚款石英细脉。该罚款 在混凝土骨料是一个相当不错排序,显性粗到中等,分四舍五入 以圆形石英只是偶尔燧石或褐铁矿粮食。 有一紧,颗粒之间的聚合与水泥粘贴不间断债券 矩阵阶段。没有水泥,骨料反应的证据。水泥粘贴阶段 良好的质量,估计水胶比为至。 核心代表的优质混凝土。 实地现场操作 最初的启动数据收集和表3-5是。 12小时后开始行动,泵的氟橡胶叶轮被破坏,可能是由于 到_nning在初始启动困难干。润湿的毯子是唯一由潮 水。叶轮和泵取代已重新启动。 系统电流 在此试验的治疗总面积为240峡湾(24平方米)。治疗面积 组成_dl五桩,并作为一个单一的区域处理。总电流供应给 桩约为80 A或 AJf - T2的( /米2)混凝土。 最大系统电压设定在48至50 V的电流调节,使 电流阳极毯是任何一个不大于,的A / _(6 A/m2)中, 最高aUowable氯去除电流密度。这些电流进行监测与 在目前的配电箱的分流。

土木工程专业毕业论文翻译

土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。土木工程共有六个专业:建筑学,城市规划,土木工程,建筑环境与设备工程,给水排水工程和道路桥梁工程。土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要的物质技术基础,对众多产业的振兴发挥了促进作用,工程建设是形成固定资产的基本生产过程,因此,建筑业和房地产成为许多国家和地区的经济支柱之一。.古代的土木工程有很长的时间跨度,大致从公元前500年新石器时代出现原始的土木工程活动到16世纪末意大利的文艺复兴,导致土木工程走上迅速发展的道路为止,前后经历了两千多年。在这段时间内,由于科学理论发展及其缓慢,土木工程也没有突破习惯的发展。从17世纪中页开始到20 世纪40年代第二次世界大战结束为止的300年间,国外的建筑取得了长足的进步。土木工程进入了定量分析阶段。一些理论的发展,新材料的出现,新工具的发明,都使土木工程科学日渐完善和成熟。到了近代,二战结束之后,许多国家经济起飞,现代科学日益进步,从而为进一步发展提供了强大的动力和物质基础。人们生活水平的不断提高,必然要求越来越舒适的居住环境,在这种情况下,建筑的发展直接推动了土木工程的发展。总的来说土木工程是一门古老的学科,它已经取得了巨大的成就,未来的土木工程将在人们的生活中占据更重要的地位。地球环境的日益恶化,人口的不断增加,人们为了争取生存,为了争取更舒适的生存环境,必将更加重视土木工程。在不久的将来,一些重大项目将会陆续兴建,插入云霄的摩天大楼,横跨大样的桥梁,更加方便的交通将不是梦想。科技的发展,以及地球不断恶化的环境必将促使土木工程向太空和海洋发展,为人类提供更广阔的生存空间。近年来,工程材料主要是钢筋,混凝土,木材和砖材,在未来,传统材料将得到改观,一些全新的更加适合建筑的材料将问世,尤其是化学合成材料将推动建筑走向更高点。同时,设计方法的精确化,设计工作的自动化,信息和智能话技术的全面引入,将会是人们有一个更加舒适的居住环境。一句话,理论的发展,新材料的出现,计算机的应用,高新技术的引入等都将使土木工程有一个新的飞跃.English is the Civil Engineering Civil Engineering, civil engineering is literally, it is the construction of the project collectively. It means building objects that the construction on the ground, underground, water works facilities, equipment and materials to use in surveying, design construction, maintenance, repair and other professional skills. Civil Engineering with the progress of the human society, has been transformed into large integrated disciplines, it has a number of branches, such as : construction, rail projects, road projects, bridge projects, special project structure, water drainage works, the port project, water, environmental engineering disciplines. A total of six professional Civil Engineering : architecture, urban planning, civil engineering, construction and environmental engineering equipment, water drainage works and road bridge Engineering as an important foundation subjects, its important attribute : an integrated, social, practicality, uniformity. Civil Engineering for the development of the national economy and improve the living standards of the people provided important material and technological foundation for the revitalization of many industries played a catalytic role in the construction of fixed assets is a basic production process, the construction and real estate in many countries and regions become a pillar of the economyAncient Civil Engineering has a long time span, roughly 500 years before Christ from the original date in civil engineering activities to the 16 century Italian Renaissance, resulting in the rapid development of the Civil Engineering on the road today, and has experienced more than 2,000 years. During this period, due to the development of scientific theories and slow, there is no breakthrough in civil engineering from 17 pages to 40 years in the 20th century end of the Second World War 300 years, foreign construction made great strides. Civil Engineering has entered a phase of quantitative analysis. Some theoretical development, the emergence of new materials, new tools of invention, the Civil Engineering Science is perfection and maturity. In modern times, after the end of World War II, many countries economic takeoff, the increasing advances of modern science, so as to provide a powerful impetus to further development and material basis. People's living conditions continue to improve, more and more comfortable living environment for the inevitable in the circumstances, the construction of development directly to the Civil Engineering development.

该计划包括六件两跨连续梁的断面图所示。 1 。考虑到预应力混凝土连续梁桥通过在桥梁工程中通常有不同的部分,因此,高度测试梁是50厘米和30厘米的中期支持和中跨部分,分别和线性变化本节之间的高度是通过中期支持和中跨一节。 设计混凝土配合比确定试验和错误。为了提高加工的混凝土,高效减水剂(高效减水剂)的使用,最后组合混凝土1: (水泥:水:砂:粗骨料:高效减水剂) 。钢纤维用于在本研究中有一个形状的连接端。基本材料特性混凝土见表1 。基本材料特性预应力肌腱和钢筋列于表2 。

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

我毕业设计的时候翻译过英文论文,不过只有3000字,不知道行不行,如果需要给我发信息。

土木外文翻译毕业论文题目

毕业设计论文施工组织设计文献综述施工组织设计的作用是对拟建工程施工的全过程实行科学的管理的重要手段。通过施工组织设计的编制,可以全面考虑拟建工程的各种施工条件,扬长避短,拟定合理的施工方案,确定施工顺序、施工方法、劳动组织和技术经济的组织措施,合理地统筹安排拟定施工进度计划,保证拟建工程按期投产或交付使用;也为拟建工程的设计方案在经济上的合理性,在技术上的科学性和实施工程上的可能性进行论证提供依据;还为建设单位编制基本建设计划和施工企业编制施工计划提供依据。施工企业可以提前掌握人力、材料和机具使用上的先后顺序,全面安排资源的供应与消耗;可以合理确定临时设施的数量、规模和用途;以及临时设施、材料和机具在施工场地上的布置方案。如果施工组织设计编制的合理,能正确反映客观实际,符合建设单位和设计单位的要求,并且在施工过程中认真地贯彻执行,就可以保证工程的顺利进行,取得好、快、省和安全的效果,早日发挥基本建设投资的经济效益和社会效益。60年代我们的施工组织措施采用的苏联的管理模式,随着我国的经济的增长,我们建筑业的发展,我们的施工项目管理也不断的更科学,70到80年代施工组织设计在我国全面的推广,经过我们不断的实践、探索、研究,使之我们现在的施工组织更科学更协调,经济上更合理以往我们强调工程开工前必须有施工组织设计,否则不得开工,但有相当多的工程虽然编制了施工组织设计,但实际执行却不如人意,甚至有的根本无法实施。许多年来,施工组织设计的编制往往是由个别人编写,在很大程度上造成与材料、机械、劳动力等部门的脱节,使施工组织设计开始就先天不足,到项目实施过程中,由于编制者与实施者的分离,无法起到指导作用的施工组织设计只能束之高阁。所以我们认识了不足之处对于实施方案的编制组织,现在我们采取各部门共同参与的方法,并由项目技术负责人主编,使施工组织设计真正起到指导工程施工的作用。施工部署由单1转向了全面统筹工程的后续开展更顺利。正 文杨太生.《地基与基础》.-北京:中国建筑工业出版社,2004.本书内容是根据本课程的教学基本要求并按照国家颁布的有关设计新规范、新标准编写的。全书共分十章,包括土的物理性质及工程分类,地基中的应力计算,土的压缩性与地基沉降计算,土的抗剪强度与地基承载力,土压力与土坡稳定,建筑场地的工程地质勘察,天然地基上浅基础设计,桩基础设计,地基处理,区域性地基等内容。本书可作为土建学科高等职业学校、高等专科学校建筑工程专业及相关专业的教学用书,也可作为相关工程技术人员的参考书。徐 蓉.《工程造价管理》. 上海:同济大学出版社,2005本书以贯彻国家法规、规范为指导思想,从基础理论和实践应用人手,主要介绍 工程造价管理的相关理论和计算评价方法。本书共9章:第一章介绍工程造价概论, 解释了价格、造价的基本概念;第二章介绍工程造价的组成和计价方法,及工程量清 单计价规范的有关内容;第三章至第七章分别介绍了工程项目决策、设计、招标投标、 施工和竣工决算等不同阶段中,建设过程中工程造价确定和管理的实际操作内容;第八、九章介绍工程财务和工程造价管理相关法规的内容,这是作为从事工程造价管理工作的工程师们所必需掌握的基本知识。尹怡林.《建筑工程计量与计价》. 天津:天津大学出版社,2003,5.本书针对建设工程清单时期广大预算人员的学习需要,介绍了建筑工程预算书的编制内容和步骤,全面叙述了消耗量定额与清单计价的定额说明及工程量计算规则,重点阐述了应用例题的详细解答与完整的建筑工程的消耗量定额预算书和工程量清单投标报价书。内容共分三部分,包括:绪论,上篇——建筑工程消耗量定额计量与计价,下篇——建筑工程工程量清单计量与计价。本书逻辑清晰,图文并茂,强调理论与实践的关联,充分结合施工组织的实际,辅以大量实例,注重例题的合理化,支持启发性与交互式教学,力求实用。本书与《建设工程计价依据与方法》配套使用,学习过程中需配备参考文献所列书籍。本书可作为高职高专院校建筑类专业的选用教材,也可作为建筑企业管理培训教材,还可作为企事业单位中高层管理人员与技术人员的参考用书。姚刚.土木工程施工技术.北京:人民交通出版社,2005,3土木工程施工是土木工程专业的一门主干课。其主要任务是研究土木工程施工技术和施工组织的一般规律;土木工程中主要工种工程施工方法和工艺原理;施工项目科学的组织原理以及土木工程施工中的新技术、新材料、新工艺的发展和应用。新的《土木工程施工》教材阐述了土木工程施工的基本理论及其工程应用,在内容上力求符合国家现行规范、标准的要求,反映现代土木工程施工的新技术、新工艺及其新成就,以满足新时期人才培养的需要;在知识点的取舍上,保留了一些常用的传统工艺方法,注重纳入对工程建设有重大影响的新技术,突出综合运用土木工程施工及其相关学科的基本理论和知识,以解决工程实践问题的能力培养。教材在结构体系上有新的突破,具有创新和鲜明的时代特色。教材注重土木工程各专业领域知识的融合,使之成为一个有机的整体。教材层次分明、条理清楚、结构合理,既考虑了大土木工程专业的整体性,又结合现阶段课程设置的实际情况,在土木工程的框架内,建筑工程、道路工程、桥梁工程、地下工程等自成体系,便于组织教学。钱昆润等.建筑施工组织与计划.南京:东南大学出版社,2009本手册内容分为4大部分:一、建筑施工基础知识,包括建筑构造、施工测量、建筑材料、施工 实用结构计算;二、建筑施工技术,包括土建土施工及水暖、卫生、电器设备工程施工;三、建筑施工管理,包括定额与预算、施工组织设计、企业管理;四、建设监理知识及工程招标投标与合同管理。最后在附录中给出了施工常用资料及数据。中华人民共和国建设部.建设工程工程量清单计价规范.北京:中国计划出版社,2003本 规范是根据《中华人民共和国招标投标法》、建设部第107号《建设工程施工发包与承包计价管理办法》,按照我国工程造价管理改革的要求,本着国家宏观调控、市场竞争形成价格的原则制定的。 本规范在编制过程中,总结了我国建设工程工程量清单计价试点工作的经验,并借鉴了国外工程量清单计价的做法。本规范批准发布前广泛征求了有关施工单位、建设单位、工程造价咨询机构和工程造价、招标投标管理部门的意见,对其中主要问题进行了多次讨论和修改。 本规范共分五章和五个附录,包括总则、术语、工程量清单编制、工程量清单计价、工程量清单及其计价格式等。Park Yj and A Seismic Damage model for reinforced of Structural Engineering,ASCE, progressive collapse of the building structures due to accidents has become a hot research topic of civil engineering all around the world. The researches and designs on progressive collapse are based on accurately simulation for the failure process of whole structural systems. However, due to the complicated material and geometric nonlinearity and large computational workload in collapse simulation for a real reinforced concrete (RC) structure, normal finite element (FE) analysis with solid elements are not feasible in collapse researches. Hence, a fiber beam model is proposed in this work to simulate the collapse of RC frame. The fiber beam model is firstly verified with a collapse test of a planar RC frame. And then following the design process proposed in DoD 2005, the collapse processes of two typical Chinese 8-story RC frames with and without slabs respectively are simulated and compared. The influence of slabs on the progressive collapse behavior of structures is studied and the result proofs that the slabs can greatly improve the progressive collapse resistance of . Budget busts: The influence of demand in the construction market[J].Received 25 new normalized damage index for evaluation of structural damage of reinforced concrete was developed based on the relation of demand and capacity. The proposed formulation combines two sources of damage: permanent deformation and strength deterioration due to cyclic loading during dynamic events. The new damage model is first verified for single components. Based on the compressive strains in the core concrete, tensile strains in the transverse hoops and a good photographic record of the component during stages of testing, damage limit states for serviceability, repairability/irrepairability and collapse are identified and correlated with the damage model. A global damage index is also proposed based on individual member damage indices, which uses a weighting scheme that assigns importance as a function of gravity loading. Finally, an inelastic design spectra is recommended for code development wherein the relationship between the natural period of the structure and the response reduction factor is quantified in terms of incurred structural damage.结 论建筑施工组织设计必须扩大深度和范围,对设计图纸的合理性和经济性做出评估,实现设计和施工技术的一体化。施工企业要建立施工组织设计总结与工法制度,扩大技术积累,加快技术转化,使新的技术成果在施工组织设计中得到应用。目前已是知识经济时代,信息技术在工程项目中已起到越来越大的作用,建筑施工企业应大力发展与运用信息技术,重视高新技术的移植和利用,拓宽智力资源的传播渠道,全面改进传统的编制方法,使信息在生产力诸要素中起到核心的作用,逐步实现施工信息自动化、施工作业机器化、施工技术模块化和系统化,以产生更大的经济效益,增强建筑施工企业的竞争力,从而使企业能在日益激烈的竞争中获得更好的生存环境。参考文献【1】 杨太生.《地基与基础》.-北京:中国建筑工业出版社,2004.【2】 张雅麟.《建筑施工手册》.-2版。北京:中国建筑工业出版社,.【3】 姚谨英.《建筑施工技术》.-2版。北京:中国建筑工业出版社,【4】 张 建.《建筑材料与检测》.-北京:化学工业出版社,.【5】 李晓光.《建筑工程定额与预算》.中国电力出版社,2005,1.【6】 李 泉.《浅谈如何准确编制概算、有效控制投资》.工程经济,.【7】 姚 刚.《土木工程施工技术》.北京:人民交通出版社,2005,3【8】 徐 蓉.《工程造价管理》. 上海:同济大学出版社,2005【9】 钱昆润. 建筑施工组织与计划.南京:东南大学出版社,2009【10】 尹怡林.《建筑工程计量与计价》. 天津:天津大学出版社,2003,5.【11】 刘伊生.《工程造价管理与控制》. 江苏:东南大学出版社,2004,9.【12】 徐大国.《 工程造价的与控制》. 北京:计划出版社,2005【13】 姚 冰.《与国际接轨的全过程造价控制》. 北京:建筑工业出版社,2005,11.【14】 中华人民共和国建设部. 建设工程工程量清单计价规范.北京:中国计划出版社,2003【15】 . Budget busts: The influence of demand in the construction market[J].Received 25 August2003.【16】 Park Yj and A Seismic Damage model for reinforced of Structural Engineering,ASCE,

毕业设计用的 3000字左右 外文和翻译 谢谢啦

学术堂整理了20个土木工程的论文题目供大家参考:1、基于现代理念下的土木工程施工管理策略2、土木工程施工管理中存在的问题分析3、土木工程施工中的质量控制分析4、土木工程结构设计中对抗震问题的分析5、土木工程管理施工过程中质量控制措施研究6、土木工程施工管理中存在的问题及对策分析7、项目管理在土木工程建筑施工中的应用分析8、土木工程项目施工进度管理和施工质量管理9、土木工程施工中节能环保技术探析10、土木工程的现场施工技术管理应用探讨11、土木工程施工中边坡支护技术的应用分析12、土木工程项目施工进度管理和施工质量管理探析13、土木工程建筑施工过程中项目管理的应用研究14、边坡支护技术在土木工程中的应用15、土木工程施工技术中存在的问题与创新探讨16、论土木工程建筑施工过程中项目管理的应用17、土木工程项目的施工进度与质量管理策略探讨18、土木工程施工技术和现场施工管理19、试论土木工程施工管理问题及对策20、项目管理在土木工程建筑施工中的有效应用

已经发送 注意查收

土木工程毕业论文翻译格式

The urban river embankment discuss the ecological constructionAnonymous XXXXXXXXAbstract: the urban river embankment construction as the object, discuss the current social background, analyses and compares the river embankment design of traditional methods and characteristics of ecological methods, and puts forward three modes of ecological design and their advantages and disadvantages, and expounds the present situation of the ecological construction in domestic bank and future : the bank; Ecology; Design way; Domestic situationText:A, backgroundRiver Banks part is the amphibious interlaced transition belt, has the remarkable edge effect. Here are active substances, nutrient and energy flow, offer a habitat for a variety of creatures. Natural state Banks often species richness, productivity traditional embankment design often single ?一、背景河流的堤岸部分是水陆交错的过渡地带,具有显著的边缘效应。这里有活跃的物质、养分和能量的流动,为多种生物提供了栖息地。自然状态下的堤岸往往物种丰富、生产力高。传统的堤岸设计往往会单纯从防洪角度出发,采用土堤或者土石混合堆砌起来高高的堤岸。它的优点在于高度的可靠性,结构设计后加起防护堤岸抗流水冲刷能力显著增强。对于洪水暴发频繁、侵蚀严重的区段,这样的设计无可厚非,而对于一般河流堤岸的修建,这样的设计则显得缺乏环境的美化和绿化,同时也破坏许多对生态起重要作用的自然因素,如破坏植被与河床间的联系,造成冲刷侵蚀转移等。另外,河流作为城市风貌不可多得的珍惜资源,也是城市风貌的特色要素,它的景观塑造显得十分必要。同时,堤岸景观建设必然使滨河地区土地价值提升,滨水开发的高投资回报的特点更增强了对城市堤岸景观建设的需求。二、需求——堤岸的生态化建设河流堤岸作为城市中最邻近河流的区域,是城市与河流的衔接线,它的景观规划是提高城市生活品质的需要,也是丰富城市景观的需要。生态化建设,它的根本思路是运用自然本身抗干扰和自我修复的能力来处理人与自然的关系。生态设计方法不同于传统用人工的结构和形式来取代自然的方法,而是用自然的结构和形式来顺应自然的进程。将河岸与河道在生态上联系起来,也就实现了物质、养分、能量的交流:对于生物,它提供了合适的栖息地;植物根系可固着土壤,枝叶可截留雨水,过滤地表迳流,抵抗流水冲刷,从而起到保护堤岸、增加堤岸结构的稳定性、净化水质、涵养水源的作用,而且随着时间的推移,这些作用被不断加强。同时,生态化建设以自然的外貌出现,容易与环境取得协调,造价也较低,不需要长期的维护管理。三、河流堤岸生态化设计方式河流堤岸生态化设计,要遵守生态设计的原则,注重地方性、保护与节约自然资本、让自然做功、显露自然,主要体现在对地域气候环境、河流地质地貌、水文变化的适应,对河流生态环境的考虑,对堤岸地形的处理和对筑堤材料的选择和构造方式方面。1) 人工类:传统方法是采用块石或混凝土块砖等堆砌。可在此基础上加以改进以适应河流景观设计的需求。a) 块石或混凝土块砖干砌,不用砂浆。这样在砌块之间就留有空隙,为后期滨河植物的生长提供了空间。随着时间的推移,堤岸会逐渐呈现出自然的风貌。b) 堤岸采用台阶式分级,台阶面上的空间加以利用,种植植物。当然这两种改进方法对于河岸处现有植被仍存在一定的不良影响,人工痕迹也过于明显。2) 自然类:充分利用堤岸植被原型,可直接将适用于滨河地带生长的植被种植于堤岸上,利用植物的根、茎、叶来稳固堤岸,防止侵蚀、控制沉积的同时也为生物提供了栖息地。3) 人工自然相结合综合了以上两种方法的优点,具有人工结构的稳定性和自然的外貌,见效快、生态效益好,以下为常见的两种类型:a) 种植植物的堆石将由大小不同的石块组成的堆石置于与水接触的土壤表面,再把活体切枝插入石堆中使斜坡更加稳定。根系可提高强度,植被可遮盖石块,使堤岸外貌更加自然。b) 与植物结合使用的插孔式混凝土块将预制的混凝土块以连锁的形式置于岸底的浅渠中,再将植物切枝或植株扦插于混凝土块之间和堤岸上部,其上覆土压实,再播种草本植物。堤岸生态化建设也存在一定的局限性。如:选用的材料及建造方法不同,堤岸的防护能力相差很大,需要运用多学科知识认真分析,这就为设计人员提出了更大的挑战;建造初期若受到强烈干扰,则会影响到以后防护作用的发挥等。这也就对河流堤岸的生态化设计提出了更高的要求。四、国内现状1)省会城市在我国省会城市及计划单列市中有近80%进行了堤岸景观规划。(参考文献[3])城 市 项目名称 城 市 项目名称北 京 长河城市水系统综合治理 南 宁 堤岸园工程长 沙 湘江风光带 宁 波 滨江大道沿江景观工程成 都 府南河绿化工程 上 海 外滩、陆家嘴滨江大道福 州 闵江江滨公园 沈 阳 浑河观光旅游带广 州 珠江二沙段堤岸景观、芳村长堤建设 太 原 汾河公园贵 阳 南明河景观绿化工程 天 津 海河堤岸改造工程哈尔滨 松花江南岸沿江风景长廊 武 汉 汉口江滩一二期工程昆 明 盘龙江中段滨水生态景观建设 西 安 灞河大水大绿工程兰 州 黄河风情线 重 庆 南滨路滨江旅游观光大道从规划后建成情况看,这些城市河流堤岸景观项目都得到了当地政府与市民的肯定。在这些项目中,堤岸既可成为当地最具吸引力的城市公园,如太原的汾河公园和福州的江滨公园;堤岸也可成为市民日常休闲活动的热点地段,如南宁的堤路园和武汉的汉口江滩工程;堤岸还可成为城市最具特色的地段,如重庆的南滨路滨江旅游观光大道;堤岸更可成为城市旅游的热点,如上海的外滩和陆家嘴滨江大道。总之,经过景观规划的堤岸已成为当地最具特色的地区。从建设效果看,相对堤岸的原来面貌而言,统计资料中的这些景观工程都是较成功的,都成为当地城市关注的热点,成为当地政府的政绩工程,成为当地的民心工程。城市河流堤岸通过景观规划,有效地改善了滨河地段的环境,并带动滨河地段的开发。但必须清醒地认识到,这些城市堤岸景观项目规划并非尽善尽美,也存在这样或那样的问题,仍有待完善。2)中小城市城市经济实力的强大决定了其城市建设水平的高标准和高水平。中小城市河流堤岸景观与统计资料中的城市存在较大的差距,存在更多的问题。特别是由于资金问题,堤岸景观是,纯人工,状态的钢筋混凝土防洪堤,或保持自然防洪状态的土石堤,没有经过景观规划,易造成城市资源的极大浪费。五、前景目前,河流景观建设,特别是城市河流景观建设,在中国正方兴未艾;在发达国家中也是一个久盛不衰的话题。 回顾发达国家河流景观建设的历史,自20世纪70年代以来,随着人们环境意识的普遍增强,重视河流景观的生态功能已成为一个时代的呼唤,河流景观建设的生态设计方法也已得到了空前的重视和发展。他山之石可以攻玉,借鉴发达国家已经形成的成熟的理念和做法,可以使我们少走弯路,搭上隆隆前进的生态建设之车。

有一篇施工监控的论文,你查收一下吧,希望对你有用!

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

我毕业设计的时候翻译过英文论文,不过只有3000字,不知道行不行,如果需要给我发信息。

大专土木专业毕业论文

随着我国经济的不断发展,我国城市化建设的脚步也越来越快,在这样的情况下,土木工程也得到有效的发展,并取得了一定的成绩。下文是我为大家蒐集整理的关于的内容,欢迎大家阅读参考!

浅析土木工程施工管理的主要问题

摘要:随着我国国民经济的提升,人们生活水平逐渐提高,选择舒适、温馨的住宿环境成为人们关注的重点,进而提升了建筑领域的发展速度,土木工程施工数量随之递增。在施工数量递增的同时,人们更加关注其管理。为了进一步研究本选题内容,提高研究价值,本文概述了土木工程施工的基本内容,分析了施工管理过程中存在的主要问题,并提出了针对性的对策建议,以期达到研究的实效性。

关键词:土木工程;施工管理;安全意识

土木工程施工是当前建筑行业极为关注的问题,也是其工作开展的基础,是核心内容,其施工管理好坏直接关系到土木工程的建设情况。所以,该项工作受到了高度的重视。在现阶段的土木工程专案建设过程中,施工管理仍存在一些问题,不仅对施工质量造成一定的影响,如果处理不当,还会对人身安全、财产安全造成严重的影响。

1土木工程施工基本内容

土木工程施工的主要内容

土木工程施工是建造各类工程设施的统称,其具有一定的科学性与技术性,主要包括施工所应用的材料、施工所用的装置等。不仅如此,在实施施工过程中,还要展开一系列的工作内容,比如,在选定的建筑地进行勘测,当勘测工作完成以后由专业的建筑人员进行施工前的设计工作,施工人员依据设计图纸进行施工,施工完成以后还要对建筑专案进行保养与维修[1]。

土木工程施工的特点

建筑行业不断发展,土木工程施工数量逐渐增多。由于土木工程施工自身具有一定的特殊性,使得工作难度不断加大。其主要特点在于以下几个方面:首先,工程较为复杂。在进行施工过程中,由于其功能多、型别杂,施工难度相对较大。即使功能及型别相似,仍存在环境不同的现象,也会导致施工质量存在一定的差距;其次,施工环境相对恶劣,在土木工程施工过程中,由于其施工面积性对较大,大多采取露天作业的方式,进而导致施工环境较为恶劣,影响施工质量,一旦遇到天灾,施工不得不中断,进而延长施工工期,增加施工成本;最后,施工周期相对较长。由于土木工程具有复杂多变的特点,而且受外界因素影响较大,使得施工周期增加,所以,只有确保设计人员与施工人员稳定工作,完善施工管理工作,才能按时完成施工工作[2]。

2土木工程施工管理中存在的主要问题

施工流程存在的问题

在整个土木工程施工过程中,流程问题是最为关键的。由于工程专案较为庞大,在人力、物力以及财力方面耗费较大,所以,处理好施工流程能够节省建筑成本。当前,土木工程施工流程虽然取得了一定的成绩,使得施工工作得以完善,但是,从某种角度来说,总的施工流程还是存在一定的问题的,需要相关人员给予解决。在现阶段的土木工程施工中,一些施工单位的流程过于简单,缺乏详细的规程,一旦出现问题,无法及时、有效处理,进而影响工程质量。不仅如此,一些施工单位在制定施工流程的过程中,为了节省制定时间,采取重复使用施工流程的方式,按照传统的施工流程执行施工工作[3]。这种做法虽然为施工工作抢得了一定的时间,但是,由于土木工程影响因素较多,一旦施工流程没有被有效执行,会造成严重的影响。比如,施工进度出现问题、施工安全出现问题等。施工流程要具备一定的详细性,不可单一存在,就当前施工流程而言,问题不可忽视。

管理体制不健全

在建筑领域,管理体制存在问题是较为普遍的现象,也是相对棘手的问题。从某种意义上来说,工程管理的有效执行是依据管理体制展开的,管理体制的存在是管理工作开展的基础、是保障,如果管理体制不健全,对整个工程管理来说,会产生一定的不良影响。在现阶段的土木工程施工中,一些施工单位为了节省成本,在施工进行时将管理部门实施削减,管理人员被随便安插在其他部门,更有甚者,一名管理人员身兼数职,在协调管理过程中无法发挥自身的作用。长此以往,管理人员对工作会产生一定的懈怠情绪,进而失去工作的积极性,使得管理工作无法落到实处[4]。究其原因,是管理体制不够健全,在对施工人员、管理人员进行管理的过程中,无法按照规章制度进行有效管理,从而令管理工作浮于表面,没有体现出管理的真正作用。

施工质量存在问题

在土木工程施工过程中,施工质量存在的问题主要是前期准备以及用料质量两个方面。首先,在前期准备工作方面,通常情况下,施工单位以及施工人员在确定工程专案竞标成功以后才着手准备,导致前期准备时间较短,准备工作不足。不仅如此,在施工前期的准备工作中,外聘人员技术水平相对较差、缺乏一定的管理经验,管理工作不到位,使得施工质量存在严重问题;其次,由于聘用的采购人员缺乏一定的专业性,在采购工程用料的过程中,往往更加注重节省建设成本,忽略了材料的可用性,选择价格相对较低的原材料。所以,原材料的选择不合格,无法达到质量标准,不仅导致施工质量存在问题,还会延误施工工期,对土木工程施工造成严重的影响,增加施工单位的施工成本[5]。

施工人员安全意识薄弱

近年来,建筑行业不断发展,房地产事业节节攀升,进而诞生了多家小型的建筑企业。在这些小型的建筑企业施工过程中,更加注重短期利益,追求一己私利,对施工安全不够重视。不仅如此,施工人员安全意识薄弱,存在一定的安全隐患。在土木工程施工过程中,施工人员缺乏文明施工意识,对安全施工认识不足,没有按照规定正确佩戴安全帽,施工人员的安全受到了一定的威胁,存在一定的安全隐患。不仅如此,在土木工程建设过程中,防护措施搭建不合格也会对施工人员安全造成威胁。据相关资料统计,2014年建筑施工引发的事故为83起,占总数的,死亡人数为328人,究其原因,在于施工人员安全意识薄弱。总而言之,土木工程施工中存在的安全隐患相对较多,施工人员安全意识薄弱势必对自身安全以及财产安全造成一定的影响[6]。所以,在这种情况下,只有提升施工人员的安全意识,才能确保专案施工的稳步进行,才能确保管理水平的提升。

施工现场秩序较差

在土木工程建设施工过程中,施工现场的秩序尤为重要,科学、合理地维护施工现场的秩序,不仅能够促进施工质量的提升,还能缩短施工周期,提升施工成本。但是,就当前土木工程施工管理来说,施工现场秩序管理相对落后,施工现场秩序较差,对施工质量以及施工进度等均有所影响。土木工程施工管理是施工人员及施工单位的保障,需要充分发挥监理人员的工作职责。监理人员的职责在于协调整个工程的运作,包括工程造价、工程进度的衡量以及工程质量的监督等。从某种意义上来说,监理工作贯穿于整个工程施工当中,对施工现场的秩序维护具有重要的帮助。监理人员在管理过程中,如果任何一个环节没有协调处理好,就会对工程造价产生影响,从而失去对工程造价的有效监督及控制。如果对工程造价失去监督及控制,势必对整个工程专案造成影响,比如,工程质量问题、延长工程周期、提升工程建设成本等[7]。在这样的情况下,使得施工现场无秩序可言,从而导致施工专案无任何保障可言。

3解决土木工程施工管理问题的对策

土木工程施工管理过程中,存在的问题是不可小觑的,应采取相应的方式加以解决,从而提升管理水平,促进土木工程建设。针对上文中阐述的土木工程施工管理中存在的问题,现提出解决对策及建议,具体内容如下。

完善的施工流程

对于土木工程施工管理中存在的施工流程问题,应采取有效的措施加以解决,以最有效的方式完善施工流程,建立相应的管理制度,只有这样,才能进一步规范施工过程中的各种行为,规范施工人员的施工标准,有效预防施工管理中的各种问题。在这个过程中,首先,应对施工设计予以规划。该项工作的实施主要是确保为建筑施工提供有效的方向,并由设计人员向施工人员阐述清楚,交代施工人员必须按照设计图纸进行施工,避免出现质量问题;其次,对施工现场予以规划。由于土木工程自身的特殊性,其型别可以划分大、中、小三种,在进行不同型别的施工时,应依据制度对其进行强制性规范,以提升施工质量,确保施工安全;最后,由于土木工程工期时间紧,依据施工流程能够确保规范化施工,避免不必要问题产生,并制定多元化的施工方案,以期为土木工程施工管理提供更大的帮助[8]。总的来说,施工流程是整个施工管理中的关键,完善施工流程至关重要。

建立健全管理体制

在土木工程施工过程中,管理体制不健全,对各部门以及各人员的管理都会存在一定的难度,建立健全的管理体制,不仅能够规范施工现场中的行为,确保施工现场的安全,还能预防土木工程施工过程中出现的问题,进而有效解决问题,确保工程施工的整体质量。我国当前土木工程施工管理体制存在的问题,需要相关部门进行改革[9]。在这个过程中,需要 *** 职能部门提供政策扶持, *** 职能部门可以借鉴西方发达国家的成功经验,结合我国实际情况,制定出符合我国土木工程管理的管理体制。同时,建筑企业自身应意识到管理体制的重要性。施工单位在实施建设过程中,应提供科学、合理的设计方案,并将科学技术充分地运用起来。与此同时,在施工管理过程中,设定专门的管理部门,使管理工作更具针对性,摒弃一人多职的现象,在管理人员的选拔上,不仅要注重其专业知识能力,要求其具备一定的管理协调能力,当施工过程中遇到棘手问题时,能够有效解决。

加强对施工工作的质量管理

对于土木工程专案来说,其质量好坏直接决定这工程的好坏。为进一步解决施工质量管理问题,提高管理水平,应加强对施工工作的质量管理。施工质量涉及的人员较多,每个施工环节均涉及一定的质量问题。所以,在这个过程中,要加强施工人员以及管理人员等质量管理意识,并充分认识到质量管理的重要性。施工单位在施工前期可以进行宣传,对文明施工、安全施工等内容进行全面的阐述,并要求施工人员以及相关人员认真学习。作为质量的管理者来说,不仅要具备一定的管理知识,还应具备一定的管理经验,对管理人员进行选拔,以竞聘的方式选拔出优秀的管理者,并在上岗前进行专业的管理培训,普及施工过程中的管理知识。前期工作准备充足以后,要对原材料的采购进行专业指导,要求管理者认真学习采购知识,选择质量较好的原材料,以保证施工质量[10]。只有不断提升管理人员的专业知识、丰富其管理经验,才能确保施工顺利进行,从而提高建筑企业的经济效益,保障施工质量总体提升。

提高施工人员的安全管理意识

在任何一个专案施工过程中,人员安全、施工质量都是第一位的。一旦在施工过程中出现安全事故,就会对人身安全、财产安全等造成严重的威胁,进而影响施工进度。从某种意义上来说,施工人员的安全意识关乎整个施工程序及质量。我国相关部门在安全施工方面虽出台了一系列政策法规,并提出了明确的要求,对建筑企业予以一定的规范。但是,就目前施工来说,还存在一定的安全问题。施工人员的安全管理意识薄弱,缺乏对安全的有效认识,未佩戴安全帽、安全标语缺失等现象比比皆是,极易出现安全事故。所以,面对这种情况,应提高施工人员的安全管理意识,在施工现场张贴安全警示标语、施工前期对所有施工人员进行安全动员大会等等,让所有参与施工的工作人员充分认识到安全施工、文明施工的重要性,从而提高安全意识,减少事故发生的机率,不仅能够提高施工质量,还能缩短施工周期,为施工单位节省建设成本[11]。

加强施工现场秩序维护

在土木工程施工管理过程中,施工现场秩序差会严重影响施工质量以及施工安全。从某种意义上来说,对建筑企业而言,加强施工现场秩序维护工作是重中之重,能够有效促进土木工程建设有序进行,在整个工程施工过程中,发挥着重要作用。监理人员作为施工现场秩序维护的管理者,在实施管理的过程中,应给予一定的重视。监理人员在施工管理过程中,应提高工作积极性,具有良好的工作态度,将其职能作用充分发挥出来[12]。监理人员要协调好工程施工各个环节之间的关系,以做到有效监督及控制,进而通过监督及管理将其作用展现出来。可以说,施工单位想在竞争激烈的市场中取得一席之地,最好的方式即加强施工现场秩序的维护,提高施工质量,确保施工安全。施工现场管理水平优劣与否,直接关系到整个工程的管理,故对施工现场秩序进行有效维护,不仅仅是监理人员的职责,更是每一个参与施工的工作人员的职责,只有这样,才能将整体施工质量提升。

4结束语

综上所述,本文对施工管理中存在的主要问题进行了具体分析。在土木工程专案建设方面,施工管理中的问题是相对较多的,不仅影响专案建设,对其他领域的发展同样产生影响。所以,在剖析问题的同时,提出合理化的对策建议,以完善整个施工管理工作,提高施工管理质量,为土木工程长远发展提供帮助。

参考文献:

[1]余君.基于土木工程施工管理问题的探究性分析[J].企业导报,2011,12***10***:62-63.

[2]任秀军.浅谈土木工程施工管理中存在的问题及对策[J].中小企业管理与科技:上旬刊,2013,22***4***:62-63.

[3]宋海军.浅谈土木工程施工管理过程中存在的问题[J].价值工程,2013,32***26***:90-91.

[4]王晶.土木工程施工管理中存在问题的分析[J].黑龙江科技资讯,2014,17***35***:267.

[5]母北峰,赵新利.土木工程施工管理中存在的问题及对策分析[J].科技风,2015,28***12***:202.

[6]谢军涛.浅析土木工程施工管理中存在的问题分析[J].科技与企业,2015,24***11***:16.

[7]严仲虎.土木工程施工管理中存在的问题分析[J].中国房地产业,2015,30***Z2***:120.

[8]姜威.土木工程施工管理中存在的问题及其改进措施[J].中国高新技术企业,2015,22***32***:182-183.

[9]褚聚敏.基于土木工程施工管理问题的探究性分析[J].中小企业管理与科技:上旬刊,2014,23***5***:45-46.

[10]吴良辉.土木工程施工管理中存在问题的分析[J].江西建材,2014,34***20***:256-257.

[11]甄维鹏.土木工程施工管理中存在问题的解析[J].科技风,2013,26***23***:121.

[12]徐超.土木工程施工管理中存在的问题及对策[J].山西师范大学学报:自然科学版,2013,27***S2***:149-150,

>>>下页带来更多的

希望可以帮到你,有什么不懂的可以问我,下面对论文写作提供一些参考建议仅供参

考:

学术论文写作的目的就是要表述科学研究成果,进行学术交流,下面是小编搜集整理的医

学论文写作基本格式,欢迎阅读参考。

(一)标题(title)

1.阐述具体、用语简洁:一般不超过20个字。

2.文题相称、确切鲜明:标题体现内容,内容说明标题。

3.重点突出、主题明确:突出论文主题,高度概括,一目了然。不足以概括论文内容

时,可加副标题(破折号、括号或加序码)。

(二)作者署名(author)

1.作者署名的意义

(1)明确论文责任:文责自负

(2)获得应有的荣誉:载入科技发展的史册

(3)文献检索的需要:著者检索

(4)明确著作权:人身权和财产权

2.作者署名的原则

署名的个人作者,只限于选定研究课题和制定研究方案,直接参加全部或主要部分研

究工作并做出贡献,以及参加撰写论文并对内容负责的人。(GB7713-87《科学技术报告、

学位论文和学术论文的编写格式》)

3.作者署名的要求

(1)分为集体署名和个人署名。

(2)第一作者应是论文课题的创意者、设计者、执行者,是论文的执笔者。

(3)多人合写时,主在前,次在后;多单位合写时,用脚注标明。

(4)作者人数不易过多,一般不超过6人。

(5)指导、协作、审阅者可列入致谢中。

(三)摘要(abstract)

1.摘要内容和格式

一般格式:

(1)目的(objective):说明论文要解决的问题及其起源、由来。

(2)方法(methods):说明研究时间、参加完成研究的患者或受试者的人数和研究的主

要方法。

(3)结果(results):说明研究内容中主要结果,包括数据和统计学检验结果。

(4)结论(conclusions):说明主要结论,包括直接的临床应用。

其它格式

(1)目的(objective, purpose, aim, background):论文要解决的问题及其起源、由

来、研究背景。

(2)设计(design):论文基本研究设计。

(3)地点(setting):研究地点、单位、等级。

(4)对象(subjects, patients):论文研究的时间、参加完成研究的患者或受试者的人

数和研究的主要方法。

(5)处理(intervention):论文的临床治疗和其它处理方法。

(6)检测(measures):论文为评定结果而进行的主要测试项目。

(7)结果(results):说明研究内容中主要结果和数据。

(8)结论(conclusions):说明主要结论,包括直接的临床应用。

2.摘要的写作要求

(1)连续写出,不分段落,不加小标题,不举例证。

(2)格式规范化。

(3)简短、完整,一般占全文文字的10%左右。

(4)文字性资料,不用图、表、化学结构式。

(5)内容基本一致的英文摘要。

(四)关键词(key words)

关键词是表达科技文献的要素特征,是具有实际意义的词或词组。

主题词是规范化的关键词,关键词是具有灵活性和广泛性的自由语言。

现阶段关键词和主题词都作为检索语言使用。由于关键词是自然语言,同义词、近义

词、多意词未统一,造成检索误差,故目前多采用从医学主题词表(MeSH)中选择。

1.关键词格式

3-8个词或词组,之间空一格书写,不加标点符号。外文字符之间

可加逗号,除专有名词的字首外,余均小写。

2.选择关键词的方法

(1)可从标题、摘要和全文内容中选择,以从标题中选择最常用。

(2)要严格筛选,充分、准确、全面地反映文章的中心内容。

(3)查阅医学主题词表确认。

(五)引言(introduction)

1.引言的基本内容

(1)简要叙述研究此项工作的起因和目的

(2)研究此项工作的历史背景

(3)国内外对研究此项工作的研究现状和研究动态

(4)强调此项工作的重要性、必要性和研究意义

(5)适当说明研究此项工作的时间、材料和方法

2.引言的写作要求

(1)简明扼要,重点突出:一般为200-500字,约占全文的1/8-1/10。

(2)实事求是、客观评价:不能蓄意贬低前人,切忌妄下断言。

(3)少用套话:水平如何,自有共论。

(4)勿与摘要相同,避免与正文重复:不涉及结果或结论。

(5)一般不写“引言”字样标题。

(六) 材料与方法(materials and methods)

1. 实验对象:

①动物:名称、品种、数量、来源、年龄、性别、分组标准与方法。

②微生物或细胞:种、型、株、系、培养条件和实验室条件。

③临床病例:来源、数量、性别、年龄、病因、病程、病理诊断、分型标准、选择标

准。

2. 实验仪器:仪器设备名称、生产厂家、型号、操作方法、改进之点。

3. 实验材料:药品和试剂的名称、成份、规格、纯度、来源、出厂时间、批号、浓度

、剂量、给药方法、途径、用药总量。

4. 实验方法与条件:

①临床病例:观察方法、指标、治疗方法、药物名称、剂量、使用方法、疗程。

②手术与标本:手术名称、术式、麻醉方法、标本制备过程。

③实验室:实验与记录手段、观察步骤、指标、注意事项、方法改进及依据。

5. 统计学方法

(七)结果(results)

结果是论文价值所在,是研究成果的结晶。全文的结论由此得出,讨论由此引发,判

断推理和建议由此导出。

1.结果的内容

(1)数据:不用原始数据,要经统计学处理。

(2)图表:用于显示规律性和对比性。

(3)照片:能形象客观地表达研究结果。

(4)文字:对数据、图表、照片加以说明。

2.结果的写作要求

(1)按实验所得到的事实材料进行安排,可分段、分节,可加小标题。

(2)解释客观结果,不要外加作者的评价、分析和推理。

(3)结果要真实性,不可将不符合主观设想的数据或其它结果随意删除。

(4)因图表和照片所占篇幅较大,能用文字说明的问题,尽可能少用或不用图表或照片

(八)讨论(discussion)

讨论是论文的重要主体部分,是作者对所进行的研究中所得到的资料进行归纳、概括

和探讨,提出自己的见解,评价其意义。

讨论的内容

(1) 对实验观察过程中各种数据或现象的理论分析和解释。

(2) 评估自己结果的正确性和可靠性,与他人结果比较异同,并解释其原因。

(3) 实验结果的理论意义及对实践的指导作用和应用价值。

(4) 作用机制或变化规律的探讨。

(5) 同类课题国内外研究动态及与本文的关系

  • 索引序列
  • 土木专业毕业论文翻译
  • 土木工程专业毕业论文翻译
  • 土木外文翻译毕业论文题目
  • 土木工程毕业论文翻译格式
  • 大专土木专业毕业论文
  • 返回顶部